Parts one, two and three of the Khaf-Herat railway have been inaugurated and put into operation at order of the Presidents of Iran and Afghanistan.
The construction of parts one, two and three of the Khaf-Herat railway, with a length of 140 km, has cost 1.8 trillion tomans, according to Iran’s presidency.
Khaf-Herat railway is 225 km long and its operation is carried out in 4 sections.
Parts one and two are 78 km long in Iran and from Khaf city to the border in Khorasan Razavi province.
Parts three and four of the railway are 147 km long in the Afghanistan soil from the border to Rozanak 62 km and from Rozanak to Herat 85 km, of which 140 km was put into operation today. (ILKHA)
LEGAL WARNING: All rights of the published news, photos and videos are reserved by İlke Haber Ajansı Basın Yayın San. Trade A.Ş. Under no circumstances can all or part of the news, photos and videos be used without a written contract or subscription.
IsrThe shelling targeted multiple towns, including Khiam, Taybeh, Rub al-Thalathin, and Marjaayoun, causing injuries and damaging civilian areas.aeli occupation forces (IOF) launched a series of artillery attacks across southern Lebanon on Thursday, violating the ceasefire agreement, local sources reported.
As winter's chill sets in across regions plagued by conflict and poverty, the international aid organization European Orphan Hand (Avrupa Yetim Eli) has stepped up its humanitarian efforts to provide much-needed relief to some of the most vulnerable populations.
Russian President Vladimir Putin issued stark warnings on Thursday, stating that Russia would use all available weapons if Ukraine were to acquire nuclear arms.
Israeli tank fire targeted six areas in southern Lebanon on Thursday, breaching the recently established ceasefire between Israel and Hezbollah, according to the Israeli military and Lebanese sources.